Projects >> U-068 >> PS01 >> SV01

SV01: Calaveras Dam Slow Slip Landslide (U-068) - Oak Ridge (PS01)


DOI: 10.7283/R3N38R
Citation: 10.7283/R3N38R

Project: Calaveras Dam Slow Slip Landslide (U-068)
  • PI: Dr. Noah Finnegan
  • Project Lead: John Galetzka
  • Funding Source: None
Project Site: Oak Ridge (PS01)
Field Start Date: Feb. 12, 2018
Field End Date: Feb. 16, 2018

Field Engineer: John Galetzka
Other Personnel: Dylan Schmeelk,Alex Nereson, Colleen Murphy
Other Equipment: Mavic Pro drone with stock camera
Metadata Report: 2018-02-16_U-068_OakRidge_Metadata.pdf